PERMIT STATUS: Approved. 8/25/11. dw. /// Approved 9/1/09 slc /// corrections 8/27/09 slc /// 7/30/09 slc
Permit requires Right-Of-Way, Traffic Engineering, Public Works Engineering and Stormwater reviews. Permit will be routed within the department. Pay Traffic review fee. /// All disciplines have approved. 8/25/11. dw.
Provide a plot plan by a registered State of Alaska Land Surveyor. Site plan provided is by a professional engineer. /// plot plan submitted 9/1/09 - ok. 9/1/09 slc
Provide parking calculations for all existing and proposed uses on this lot. Sq. footages and uses listed under code data indicate 20700 sq. feet of Hangar and 3290 sq. feet of office. 32 spaces required. Please verify. NOTE: only 31 spaces shown /// see new sheet C1 - parking calculations provided. 31 spaces required. 8/27/09 slc /// See new approved parking plan, approved by D. Ferguson, Traffic, 8/25/11. dw.
One type A loading berth is required, please indicate loading area on site plan. /// loading berth shown on site plan. 8/27/09 slc
Zoning review incomplete pending receipt of requested information. Additional comments may result. 8/18/09 - reviewed the new site plan, sheet C.1. Appears that the lot lines have changed. Please provide evidence thatthere was a replat vacating the previous property line. agler 8/18/09 /// see Deed in file that describes property - there was an error on the original site plan - this deed paperwork plus the survey'd plot plan should show that the property is all one lot, deed description will be verified when survey is received. 8/27/09 slc /// see new survey by Ken Lang - all one lot. 9/1/09 slc