Permit Number: 09 4641
Permit Type: Commercial Building Permit - None BldgAlter
Address: 2801 DEBARR RD Anchorage
Location:
Work Description: Work Descr: Install roof mount antennas & cellular equipment for cellular facility; (2) inspections, Remarks: tb
Status: Issued
Project Name: ALASKA REGIONAL
Review Type: Electrical
Result: Approved
Result Date: 7/30/2009 12:00:00 AM

Comments:

 Code SectionReview CommentStatus



Advisory Information:

. Status: Electrical Corrections required. 7/21/09 Status: Full Electrical Approval. 7/30/09 The following comments based on the 2008 National Electrical Code (NEC) must be resolved before a permit is issued. The plans and specifications do not permit the violation of any section of the NEC or any federal, state, or local regulations. Drawing E1.0, Please show the grounding electrode system for the new service. Chad W. at New Horizons Telecom (on behalf of GCI) has confirmed that the grounding electrode system per NEC Article 250 for the new service will be added to the plan set. 7/21/09 RESOLVED. The grounding electrode system per NEC Article 250 for the new service has been added to the plan set. 7/30/09 Drawing E1.0, Please provide signage for the new service. Chad W. at New Horizons Telecom (on behalf of GCI) has confirmed that signage per NEC Article 230 I (D) for the new service will be added to the plan set. 7/21/09 RESOLVED. The signage per NEC Article 230 I (D) for the existing hospital service and for the new service has been added to the plan set. 7/30/09 Drawing E2.0, Please provide 30 inch wide by 36 inch deep operator clearance for the new safety switch. Chad W. at New Horizons Telecom (on behalf of GCI) has confirmed that 30 inch wide by 36 inch deep operator clearance per NEC Article 110.26 (A) (1) for the new safety switch will be added to the plan set. 7/21/09 RESOLVED. The 30 inch wide by 36 inch (4 feet actually shown) deep operator clearance per NEC Article 110.26 (A) (1) for the new safety switch has been added to the plan set. 7/30/09