Permit Number:
99 5733
Permit Type:
Commercial Building Permit - None BldgNew
Address:
6200 BOEING AVE Anchorage
Location:
Work Description:
Work Descr: 20,715 sq ft warehouse 10-15-99 updated underground plbg permit to include total scope of work cr, Remarks:
Status:
Closed
Project Name:
MAPCO WAREHOUSE, BLDG B
Review Type:
Storm Water
Result:
Approved
Result Date:
10/25/1999 9:18:13 AM
Comments:
Code Section
Review Comment
Status
Advisory Information:
. . A Stormwater Treatment Plan is required for this project. If the Stormwater Treatment Plan for this project has been approved by ADEC, a copy of their letter needs to be provided. If not, a Stormwater Treatment Plan must be submitted to MOA and approved for this project. A Stormwater Treatment Plan is required for this project. If the Stormwater Treatment Plan for this project has been approved by ADEC, a copy of their letter needs to be provided. If not, a Stormwater Treatment Plan must be submitted to MOA and approved for this project. This project will be constructed under the requirements of the Municipal Separate Storm Sewer System (MS4) National Pollutant Discharge Elimination System (NPDES) Permit No. AKS05255-8. Prior to the commencement of work, a stormwater treatment plan, as described in the Municipality's Stormwater Treatment Plan Review Guidance Manual must be submitted to Public Works and approved. The minimum stormwater treatment plan requirements are specific to site and development characteristics. This project will be constructed under the requirements of the Municipal Separate Storm Sewer System (MS4) National Pollutant Discharge Elimination System (NPDES) Permit No. AKS05255-8. Prior to the commencement of work, a stormwater treatment plan, as described in the Municipality's Stormwater Treatment Plan Review Guidance Manual must be submitted to Public Works and approved. The minimum stormwater treatment plan requirements are specific to site and development characteristics. Compliance with the site specific minimum requirements is developed and demonstrated through the preparation and implementation of a stormwater site plan, which includes the selection, design, and implementation of best management practices. A stormwater site plan will require both an erosion and sediment control plan and a permanent stormwater quality control plan. Compliance with the site specific minimum requirements is developed and demonstrated through the preparation and implementation of a stormwater site plan, which includes the selection, design, and implementation of best management practices. A stormwater site plan will require both an erosion and sediment control plan and a permanent stormwater quality control plan. Erosion and sediment control is necessary to comply with federal, state, and municipal laws that prohibit unpermitted discharge of pollutants, including sediments, that are a result of erosion and other construction activities. This project must conductwork so sediment is not transported onto the roadway or adjacent property. Erosion and sediment control is necessary to comply with federal, state, and municipal laws that prohibit unpermitted discharge of pollutants, including sediments, that are a result of erosion and other construction activities. This project must conductwork so sediment is not transported onto the roadway or adjacent property. The most efficient way to review this project is for the engineer to provide copies of the worksheets they used from Section 4 of the Stormwater Treatment Plan Review Guidance Manual and Section 3 of the Erosion and Sediment Control and Materials Containment Guidance Manual, along with the items called for in the Stormwater Site Plan Review Checklist, when they make their next submittal. The most efficient way to review this project is for the engineer to provide copies of the worksheets they used from Section 4 of the Stormwater Treatment Plan Review Guidance Manual and Section 3 of the Erosion and Sediment Control and Materials Containment Guidance Manual, along with the items called for in the Stormwater Site Plan Review Checklist, when they make their next submittal