Permit Number: 99 5733
Permit Type: Commercial Building Permit - None BldgNew
Address: 6200 BOEING AVE Anchorage
Location:
Work Description: Work Descr: 20,715 sq ft warehouse 10-15-99 updated underground plbg permit to include total scope of work cr, Remarks:
Status: Closed
Project Name: MAPCO WAREHOUSE, BLDG B
Review Type: Plumbing
Result: Approved
Result Date: 10/25/1999 10:51:17 AM

Comments:

 Code SectionReview CommentStatus



Advisory Information:

. . The following comments based on the 1997 Uniform plumbing Code must be resolved before a permit is issued. The approval of plans and specifications doesnot permit the violation of any section of the Uniform plumbing Code or any federal, state or localregulations. All 3 copies of plans on file at Building Safety must be revised to address the comments before a permit will be issued. STATUS: ALL COMMENTS RESOLVED 5-8-00.. The following comments based on the 1997 Uniform plumbing Code must be resolved before a permit is issued. The approval of plans and specifications doesnot permit the violation of any section of the Uniform plumbing Code or any federal, state or localregulations. All 3 copies of plans on file at Building Safety must be revised to address the comments before a permit will be issued. STATUS: ALL COMMENTS RESOLVED 5-8-00.. P1.0: Reference the fixture schedule. The 2 compartment sink requires a 2 inch waste in accordance with table 7-3. P1.0: Reference the fixture schedule. The 2 compartment sink requires a 2 inch waste in accordance with table 7-3. B/P3.1: Revise drawing to show individual vents for the floor drains. Reference section 1002.1. B/P3.1: Revise drawing to show individual vents for the floor drains. Reference section 1002.1. All floor drains require trap seal protection in accordance with section 1007. All floor drains require trap seal protection in accordance with section 1007. C/P3.1: All vents shall rise 6 inches min. above the flood level of the fixture prior to offsetting horizontally per section 905.3. This can easily be done by relocating the main to the west side of the plumbing wall. Please address. C/P3.1: All vents shall rise 6 inches min. above the flood level of the fixture prior to offsetting horizontally per section 905.3. This can easily be done by relocating the main to the west side of the plumbing wall. Please address. C/P3.1: What is the purpose of the 3 inch vent taken off the main? Please clarify the flag notes (i.e. are stub ups waste or vent lines?). C/P3.1: What is the purpose of the 3 inch vent taken off the main? Please clarify the flag notes (i.e. are stub ups waste or vent lines?)