Permit Number: 98 5063
Permit Type: Commercial Building Permit - None BldgAlter
Address: W 5000 INTERNATIONAL AIRPORT RD Anchorage
Location:
Work Description: Work Descr: Reroof north terminal tear off bur and install new epdm roof install roof drain overflow scuppers, Remarks: permittype =ALTERATION, status= COMPLETE, planstatus=
Status: Closed
Project Name:
Review Type: Architectural
Result: Approved
Result Date: 4/29/1998 8:28:53 AM

Comments:

 Code SectionReview CommentStatus



Advisory Information:

. . See Section Cut 4D "New Roof Assembly" on sheet A5. See the Code Information on the cover page. Please provide the UL or FM assembly number for the required Class B rating for the roof being replaced. Reference: UBC Table 15-. See Section Cut 4D "New Roof Assembly" on sheet A5. See the Code Information on the cover page. Please provide the UL or FM assembly number for the required Class B rating for the roof being replaced. Reference: UBC Table 15-. See Section Cut 4D "New Roof Assembly" on sheet A5. Foam plastic insulation is shown directly over the existing metal deck. Please indicate a thermal barrier between the foam plastic insulation and habitable space. See the page 07530-4 in the specifications. Item 2.4 C indicates gypsum underlayment. Please update the plans. Reference: UBC 2602.5.. See Section Cut 4D "New Roof Assembly" on sheet A5. Foam plastic insulation is shown directly over the existing metal deck. Please indicate a thermal barrier between the foam plastic insulation and habitable space. See the page 07530-4 in the specifications. Item 2.4 C indicates gypsum underlayment. Please update the plans. Reference: UBC 2602.5.. See Section Cut 4D "New Roof Assembly" on sheet A5. Please submit information demonstrating the roof system is secured to the roof deck adequately to resist wind uplift from 100 mph exposure C per UBC Chapter 16. See Section Cut 4D "New Roof Assembly" on sheet A5. Please submit information demonstrating the roof system is secured to the roof deck adequately to resist wind uplift from 100 mph exposure C per UBC Chapter 16. See the Code Information on the cover page. See Section Cut 4D "New Roof Assembly" on sheet A5. Please submit data showing the roof-ceiling complies with UBC Table 6-A. See the Code Information on the cover page. See Section Cut 4D "New Roof Assembly" on sheet A5. Please submit data showing the roof-ceiling complies with UBC Table 6-A