Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To Go Back To Permit Information

Permit Number: 97 5790
Permit Type: Commercial Building Permit - None BldgNew
Address: W 325 8TH AVE Anchorage
Location:
Work Description: Work Descr: 111 unit hotel 61995 sq ft Elevator Stops 3 weight 2500 valuation 29,950 manufacturer dover Serial Number EH 8013, Remarks: permittype =NEW HOTEL, status= FINAL 6/18/98, planstatus=
Status: Closed
Project Name: CLARION SUITES
Review Type: Mechanical
Result: Approved
Result Date: 1/6/1998 9:20:48 AM

Comments:

 Code SectionReview CommentStatus



Advisory Information:

. . The following comments based on the 1994 edition of the Uniform Mechanical Code must be resolved before a permit is issued. The approval of plans and specifications does not permit the violation of any section of the Uniform Mechanical Code or any federal, state or local regulations. These comments are based on the resubmittal received November 6, 1997. The following comments based on the 1994 edition of the Uniform Mechanical Code must be resolved before a permit is issued. The approval of plans and specifications does not permit the violation of any section of the Uniform Mechanical Code or any federal, state or local regulations. These comments are based on the resubmittal received November 6, 1997. Drawing 1/M2.1: A fire/smoke damper is required on the s/a duct penetration to choice picks. Reference UBC sections 713.10 and 713.11. Revise drawing to show compliance. STATUS: ADDRESSED 1-5-98. Drawing 1/M2.1: A fire/smoke damper is required on the s/a duct penetration to choice picks. Reference UBC sections 713.10 and 713.11. Revise drawing to show compliance. STATUS: ADDRESSED 1-5-98. Drawing 1/M2.1: A fire/smoke damper is required on the s/a duct penetration to exercise room 127. Reference UBC sections 713.10 and 713.11. Revise drawing to show compliance. STATUS: ADDRESSED 1-5-98. Drawing 1/M2.1: A fire/smoke damper is required on the s/a duct penetration to exercise room 127. Reference UBC sections 713.10 and 713.11. Revise drawing to show compliance. STATUS: ADDRESSED 1-5-98. Drawing 1/M2.2: An insulated chase is required for the pool heater vent per section 23.20.804.4. Revise plans to show compliance. STATUS: ADDRESSED 1-5-98. Drawing 1/M2.2: An insulated chase is required for the pool heater vent per section 23.20.804.4. Revise plans to show compliance. STATUS: ADDRESSED 1-5-98. Drawing 3/M2.2: Since the boilers rely on supply fan SF-2 and the pressure sensor for combustion air, both devices must be electrically interlocked with the boilers to prevent the boilers from firing when either SF-2 is not operating or when the pressure sensor is reading a neutral or negative pressure. Also, the maximum exhaust flow rate for EF-6 should be reduced to 3600 CFM to allow for the 750 CFM required for combustion air. STATUS: ADDRESSED 1-5-98. Drawing 3/M2.2: Since the boilers rely on supply fan SF-2 and the pressure sensor for combustion air, both devices must be electrically interlocked with the boilers to prevent the boilers from firing when either SF-2 is not operating or when the pressure sensor is reading a neutral or negative pressure. Also, the maximum exhaust flow rate for EF-6 should be reduced to 3600 CFM to allow for the 750 CFM required for combustion air. STATUS: ADDRESSED 1-5-98
ADA Compliance      Privacy Statement & Disclaimer      Employee Search      eNewsletter      RSS