Permit Number: 09 4847
Permit Type: Commercial Building Permit - None BldgAlter
Address: 2801 DEBARR RD Anchorage
Location:
Work Description: Work Descr: TENANT IMPROVEMENT -14 INSPECTIONS, Remarks: JRD
Status: Closed
Project Name: ANCHORAGE RADIATION THERAPY CE
Review Type: Architectural
Result: Approved
Result Date: 12/15/2009 12:00:00 AM

Comments:

 Code SectionReview CommentStatus



Advisory Information:

. Status: Architectural Corrections required. 9/11/09 One additional overlooked comment was added. 9/19/09 Status: Full Architectural Approval. 12/15/09 The following comments based on the 2006 International Building Code (IBC) and 2006 International Existing Building Code (IEBC) must be resolved before a permit is issued. The plans and specifications do not permit the violation of any section of the IEBC, IBC or any federal, state, or local regulations. Drawing A1.1, First Floor Reference Plan, and Drawing A2.1, Enlarged First Floor Plan,The Toilet Room 130 indicates some accessible features; however, does not totally comply with accessibility requirements per "Accessible and Useable Buildings and Facilities" (ICC/ANSI A117.1) 2003. The Lavatory is located in the handicap bathroom W. C. clear space. The W.C. should be located with 60 inches of side clearance from the adjacent wall over to the Lavatory edge per ICC/ANSI A117.1-2003 Fig. 604.3. Please Clarify, as existing conditions may make this not feasible. 9/11/09 RESOLVED. The W.C. is now located with 60 inches of side clearance from the adjacent wall over to the Lavatory edge per ICC/ANSI A117.1-2003 Fig. 604.3. 12/15/09 Drawing A1.1, First Floor Reference Plan, and Drawing A2.1, Enlarged First Floor Plan,The Toilet Room 130 indicates some accessible features; however, does not totally comply with accessibility requirements per "Accessible and Useable Buildings and Facilities" (ICC/ANSI A117.1) 2003. The handicap bathroom W.C.s require Grab Bars per ICC/ANSI A117.1 sections 604.5 and 609. Please provide the 18 inch vertical grab bar located 39 to 41 inches from the back wall as shown on ICC/ANSI A117.1 Fig. 604.5.1. 9/11/09 RESOLVED. The 18 inch vertical grab bar located 39 to 41 inches from the back wall is now provided as shown on ICC/ANSI A117.1 Fig. 604.5.1. 12/15/09 Drawing A1.1, First Floor Reference Plan, and Drawing A2.1, Enlarged First Floor Plan, Clarify code analysis reguarding fire resistance for the new Linen Drop 135. Verify that there is no laundry chute to a basement or provide fire resistance per IBC Section 707.13 and sprinkler heads per 903.2.10.2. 9/11/09 RESOLVED. There is no laundry chute to a basement; thus, fire resistance per IBC Section 707.13 and sprinkler heads per 903.2.10.2 are not required. 12/15/09 Drawing A2.3, Partial Second Floor and Roof Plan, Verify replacement Chiller is less than 110% of the existing Chiller weight or provide structural calculations. 9/11/09 NOT RESOLVED - DEFERRED TO STRUCTURAL. The replacement Chiller is more than 110% of the existing Chiller weight; thus, it is required that a Structural Engineer provide structural calculations. 12/15/09 Drawing A5.1, Door Schedule, Identify/depict Door Type A as called out for four of the new Doors. 9/11/09 RESOLVED. The Door Type A is now redlined on Drawing A5.1, Door Schedule, as called out for four of the new Doors. 12/15/09 Drawing A5.1, Door Schedule, Identify/depict Frame Type 1 as called out for two of the new Doors. 9/11/09 RESOLVED. The Frame Type 1 is now redlined on Drawing A5.1, Door Schedule, as called out for two of the new Doors. 12/15/09 Drawings A1.2, A1.3, A2.1, A2.2, The scale appears to be incorrect on these drawings. The 3/16 inch should be 3/8 inch and the 3/32 inch should be 3/16 inch. 9/19/09 RESOLVED. The scale has been corrected on these drawings. 12/15/09