| Inspection Type | Scheduled | Assigned To | Completed Date | Result | Schedule Inspection | Inspection No. |
| Concrete Floor | | | | | Schedule Inspection | 338787 |
| Final Fire Inspection | | | | | Schedule Inspection | 338786 |
| Final Structural | | | | | Schedule Inspection | 338779 |
| FireStopping | | | | | Schedule Inspection | 338788 |
| Framing | | | | | Schedule Inspection | 338780 |
| Insulation / Vapor Barrier | | | | | Schedule Inspection | 338781 |
| Metal Pan Decking | | | | | Schedule Inspection | 338783 |
| Other Structural | | | | | Schedule Inspection | 338782 |
| S.A.Fireproofing | | | | | Schedule Inspection | 338789 |
| Seismic Bracing | | | | | Schedule Inspection | 338784 |
| Steel Bolting / Welding | | | | | Schedule Inspection | 338785 |