Inspection #: 922560
Inspection Type: Final Electrical
Inspector: M.Green
Result: Correction
Comment: Kitchen corrections, Rooftop corrections. Lobby corrections. Requested by: Ryan Heaton 9078546593 rmh@sei-ak.com

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
10/8/2026 Correct Below* Remote exterior heads.not installed.
10/8/2026TransferCorrect Below* Pool area.Not complete.
10/8/2026TransferCorrect Below* EV chargers.1. 625.21 requires OCPD to be 125% of max rating. 2. What sort of personnel protection system is included in the charger? See 2011 NEC 625.22.
10/5/2026TransferCorrect Below* Fan coil units with field installed electric heating elements.Fan requires 15A OCPD. Heating elements from 5KW to 8KW. Branch circuit breakers 30A to 45A. How are fan motors protected? Instructions seem to show some sort of internal OCPD that has not been installed.
10/5/2026TransferCorrect Below* Corrections from inspection # 92106.Various 1st floor and rooftop corrections not carried forward to this inspection.
10/5/2026TransferCorrect Below* Lobby sconces.Require bulbs for testing.
10/5/2026TransferCorrect Below* Lobby floor receptacles.Not installed.
10/5/2026TransferCorrect Below* Lobby chandaliers.Not installed.
10/5/2026CorrectedCorrect Below* Receptacles on Lobby side of bar.Receptacles within 6ft of sink require GFCI protection.
10/5/2026CorrectedCorrect Below* Landscape sprinkler controller.No apparent listing mark.
10/5/2026CorrectedCorrect Below* Mixing valve controller. (Nexa Intellistation)No apparent listing mark.
10/5/2026TransferCorrect Below* Domestic water boost pump, industrial control panel. Floor drain pipe and possibly other piping violates 110.26 working clearances.