| Date | Status | Code | Description | Ref | Location | Comments |
| 10/5/2026 | Transfer | Correct Below | * | | Miscellaneous corrections from other floors. | |
| 10/5/2026 | Transfer | Correct Below | * | | Corrections from inspection # 92106. | Various 1st floor and rooftop corrections not carried forward to this inspection. |
| 10/5/2026 | Transfer | Correct Below | * | | Lobby sconces. | Lighting control not complete. |
| 10/5/2026 | Transfer | Correct Below | * | | Lobby floor receptacles. | Not installed. No cover on the boxes. |
| 10/5/2026 | Transfer | Correct Below | * | | Lobby chandaliers. | Not installed. |
| 10/5/2026 | Transfer | Correct Below | * | | Receptacles on Lobby side of bar. | Receptacles within 6ft of sink require GFCI protection. |
| 10/5/2026 | Transfer | Correct Below | * | | Landscape sprinkler controller. | No apparent listing mark. |
| 10/5/2026 | Transfer | Correct Below | * | | Mixing valve controller. (Nexa Intellistation) | No apparent listing mark. |
| 10/5/2026 | Transfer | Correct Below | * | | Domestic water boost pump, industrial control panel. | Floor drain pipe and possibly other piping violates 110.26 working clearances. |