| Date | Status | Code | Description | Ref | Location | Comments |
| 9/24/2026 | Transfer | ACTB | ACT Correction | Complete the following corrections : | Levels 1 and 4. | During my inspection it was observed that multiple perimeter wires were cut during tile installation. We will need access to above ceiling to reinspect these 2 floors. SI has been notified and will have to reinspect as well. |
| 9/24/2026 | Transfer | ACTB | ACT Correction | Complete the following corrections : | 2nd floor corridor | Mains running across corridor are pop riveted on both sides of the wall, can only be riveted on one side. |
| 9/24/2026 | Transfer | ACTB | ACT Correction | Complete the following corrections : | 2nd floor corridor | BERC clips only fastened to the drywall. Must be attached to a framing member or wall angle. |