| Date | Status | Code | Description | Ref | Location | Comments |
| 9/21/2026 | Transfer | Correct Below | * | | Fan coil units - various Mech Rooms. | Equipment installed currently require 15A circuits. Original design shows larger equipment? Will require change order by final. |
| 9/21/2026 | Corrected | Correct Below | * | | 2nd floor ice machine receptacles. | 1. Not GFCI protected? 2. One receptacle dead? 3. Check 4th floor ice machine circuits for GFCI protection. |
| 9/21/2026 | Corrected | Correct Below | * | | 2nd floor Mech Room. | Circuits serving receptacles not properly identified. |
| 9/21/2026 | Corrected | Correct Below | * | | 2nd floor panel 2A. | Room 210, circuit 2 AFCI will not reset. |
| 9/21/2026 | Corrected | Correct Below | * | | Unit 330 breaker. | AFCI device tripping and will not reset. |
| 9/21/2026 | Corrected | Correct Below | * | | All panels. | 1. Panel schedules not completely correct. 2. Label all unused breakers as spares. 3. Breaker designations for rooftop equipment needs to include location or other identifying information. |
| 9/21/2026 | Transfer | Correct Below | * | | 4th floor panel M3. | Heat trace breakers require breaker locks. |