| Date | Status | Code | Description | Ref | Location | Comments |
| 9/21/2026 | Transfer | PlumbFinal | Comments | See Inspector Comments | Both the east side bathroom, and the west side bathroom toilets. | Per 402.2 of the 2018 UPC " Where a fixture comes into contact with the wall or floor, the joint between the fixture and the wall or floor shall be made water tight." Please caulk the base of both toilets. |
| 9/21/2026 | Transfer | PlumbFinal | Comments | See Inspector Comments | Both the east side and west bathroom water | Code compliance. Per the NEC an appliance chord is not allowed above the dropped ceiling. Please consult an electrical inspector. |
| 9/21/2026 | Transfer | PlumbFinal | Comments | See Inspector Comments | The east side bathroom and the breakroom sink. | There is no hot water. Probably because there is no vacuum relief valve. |
| 9/21/2026 | Transfer | PlumbFinal | Comments | See Inspector Comments | The cold water supply to the east side electric water heater. | Code compliance. Per the 2018 UPC 608.7, A vacuum relief valve shall be installed when the water heater is installed above the fixtures it serves. |
| 9/21/2026 | Transfer | PlumbFinal | Comments | See Inspector Comments | The electric water heaters. Above the east side and west side bathrooms. | Code compliance. Seismic restraint is required for the water heaters, per the 2018 UPC 507.5. Per the MOA amendment to this section only one strap is required. This has been a code for a few decades. |