| Date | Status | Code | Description | Ref | Location | Comments |
| 10/2/2026 | Transfer | Correct Below | * | | | 1. Provide change order showing new transformer and new panel.
2. Label new panel with available fault current and date calculated.
3. Breaker locks required for heat trace circuits. |