Click Here To View Another Inspection Inspection #: 913763 Inspection Type: CIP Closure Inspector: B.Gilgus Result: Approved Comment: Can i get a inspection at 9:00 a.m. I am pouring concrete at 11:00 Requested by: John Ducharme 907 947 3364 jducharme@rhcak.com||Clearance inspection on level 1.5 columns @ G.0/5&6, F.0/4,5,&6, and E.0/4&5. Clearances were adequate per the General Structural Notes. Preclosure- Level 1-2 wall 6.0/B.2-E.9 Reinforcement was adequate per S10-01 and details on S30-01. Level 2, pour 2 reinforcement- I observed placement of reinforcement and strand. Any deficiencies observed throughout the day were corrected. By the end of the inspection corrections were made on my observed deficiencies and the concerns addressed in the engineers report. The reinforcement and strand placement conformed to S10-02A, PT-2.00-2.02, RFI #186 and RFI #178.1. Approved Inspection Corrections DateStatusCodeDescriptionRefLocationComments