DateStatusCodeDescriptionRefLocationComments
8/4/2026 FireSprnkRoughOtherFire Sprinkler Rough Partial ApprovalFire Sprinkler Rough Partial Approval.   List area(s) approvedLobby areaOkay to cover areas of lobby
7/24/2026 FireSprinkRough9Correction(s) #5Correct the following item(s):3rd floor<strong data-start="603" data-end="938">Revise the CPVC sway bracing to comply with the manufacturer's installation requirements. Conventional longitudinal braces that apply compressive loads directly to CPVC piping are not permitted. Install approved longitudinal and lateral bracing in accordance with the manufacturer's installation instructions and NFPA 13.</strong>
7/24/2026 FireSprinkRough10Correction(s) #6Correct the following item(s):3rd floorProvide separation between electrical wiring and CPVC sprinkler piping.
7/21/2026 FireSprinkRough2Correction(s) #2Correct the following item(s):3rd and 4th floor corridor<p class="MsoNormal" style="font-size: 12px; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial; margin-bottom: 0in; line-height: 13.5pt; display: inline !important;"><span style="mso-fareast-font-family:&quot;Times New Roman&quot;;mso-bidi-font-family:&quot;Times New Roman&quot;; color:black;mso-color-alt:windowtext;mso-font-kerning:0pt;mso-ligatures:none">The hydrostatic tests and rough in inspection have passed on both the 3rd and 4th floors. Based on the current status, we can issue a Conditional Certificate of Occupancy (CCO) for the installation of furniture and fixtures on those floors while the project continues toward final completion.</span><o:p></o:p></p><p class="MsoNormal" style="font-size: 12px; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial; margin-bottom: 0in; line-height: 13.5pt;"><span style="mso-fareast-font-family:&quot;Times New Roman&quot;;mso-bidi-font-family:&quot;Times New Roman&quot;; color:black;mso-color-alt:windowtext;mso-font-kerning:0pt;mso-ligatures:none">The following conditions will apply:</span><o:p></o:p></p><ul type="disc"><li class="MsoNormal" style="line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;"><span style="mso-fareast-font-family:&quot;Times New Roman&quot;;mso-bidi-font-family: &quot;Times New Roman&quot;;color:black;mso-color-alt:windowtext;mso-font-kerning: 0pt;mso-ligatures:none">No storage of any kind is permitted in the corridors. This includes furniture awaiting installation, cardboard boxes, packing materials, trash, or any other stored items.</span><o:p></o:p></li><li class="MsoNormal" style="line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;"><span style="mso-fareast-font-family:&quot;Times New Roman&quot;;mso-bidi-font-family: &quot;Times New Roman&quot;;color:black;mso-color-alt:windowtext;mso-font-kerning: 0pt;mso-ligatures:none">All bedroom doors shall remain closed at all times during the furniture installation process.</span><o:p></o:p></li><li class="MsoNormal" style="line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;"><span style="mso-fareast-font-family:&quot;Times New Roman&quot;;mso-bidi-font-family: &quot;Times New Roman&quot;;color:black;mso-color-alt:windowtext;mso-font-kerning: 0pt;mso-ligatures:none">Once the parts arrive to repair the sprinkler bracing deficiency, a fire watch will be required anytime the sprinkler system is taken out of service to complete the repairs.</span><o:p></o:p></li><li class="MsoNormal" style="line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;"><span style="mso-fareast-font-family:&quot;Times New Roman&quot;;mso-bidi-font-family: &quot;Times New Roman&quot;;color:black;mso-color-alt:windowtext;mso-font-kerning: 0pt;mso-ligatures:none">If corridor storage is observed at any time, or if these conditions are not maintained, the CCO will be revoked.</span><o:p></o:p></li></ul><p style="font-size: 12px;"></p><p class="MsoNormal" style="font-size: 12px;"><o:p>&nbsp;</o:p></p>
6/22/2026 FireSprnkRoughOtherFire Sprinkler Rough Partial ApprovalFire Sprinkler Rough Partial Approval.&nbsp; &nbsp;List area(s) approvedNorth Covered Area onlyAll okay to proceed.
6/11/2026 FireSprnkRoughOtherFire Sprinkler Rough Partial ApprovalFire Sprinkler Rough Partial Approval.&nbsp; &nbsp;List area(s) approved1st Floor Pool, Gym and bathroomsAll okay to proceed.
6/4/2026 FireSprnkRoughOtherFire Sprinkler Rough Partial ApprovalFire Sprinkler Rough Partial Approval.&nbsp; &nbsp;List area(s) approved1st floor main hall and public bathroomsOkay to proceed.
5/19/2026 FireSprnkRoughOtherFire Sprinkler Rough Partial ApprovalFire Sprinkler Rough Partial Approval.&nbsp; &nbsp;List area(s) approved1st floor rooms only1st floor rooms are okay to cover.
3/17/2026 FireSprinkRough10Correction(s) #6Correct the following item(s):2nd floor hallprovide and maintain required space between Duct and sprinkler piping.
3/17/2026 FireSprinkRough1Correction(s) #1Correct the following item(s):2nd floor hallProvide information for compatibility with CPVC piping.&nbsp;
3/17/2026 FireSprnkRoughOtherFire Sprinkler Rough Partial ApprovalFire Sprinkler Rough Partial Approval.&nbsp; &nbsp;List area(s) approved2nd floor onlyokay to cover rooms only, Hall has correction.
1/15/2026 FireSprinkRough11NotesNotes: ADVISORY - Main piping runs along the length of the corridor could be subject to significant thermal expansion. Adjust piping and branch line penetrations as necessary // PANILO