| Date | Status | Code | Description | Ref | Location | Comments |
| 7/28/2026 | | ACTB | ACT Correction | Complete the following corrections : | 3rd and 4th floor corridor ceilings. | Provide perimeter wires to grid with in 6" of every wall.
Provide BERC clips on all non pop riveted tee's and mains. |