| Date | Status | Code | Description | Ref | Location | Comments |
| 8/4/2026 | | FireSprkHydro2 | Partial Hydrostatic Test | Partial approval for fire sprinkler system hydrostatic test for the following area(s): | 2nd and 3rd floors | Okay to proceed. |
| 7/24/2026 | Transfer | FireSprkHydro2 | Partial Hydrostatic Test | Partial approval for fire sprinkler system hydrostatic test for the following area(s): | | <p class="isSelectedEnd">The hydrostatic tests and rough in inspection have passed on both the 3rd and 4th floors. Based on the current status, we can issue a Conditional Certificate of Occupancy (CCO) for the installation of furniture and fixtures on those floors while the project continues toward final completion.</p><p class="isSelectedEnd">The following conditions will apply:</p><ul data-spread="false"><li>No storage of any kind is permitted in the corridors. This includes furniture awaiting installation, cardboard boxes, packing materials, trash, or any other stored items.</li><li>All resident bedroom doors shall remain closed at all times during the furniture installation process.</li><li>Once the parts arrive to repair the sprinkler bracing deficiency, a fire watch will be required anytime the sprinkler system is taken out of service to complete the repairs.</li><li>If corridor storage is observed at any time, or if these conditions are not maintained, the CCO will be revoked until the issues have been corrected.</li></ul> |