Inspection #: 911576
Inspection Type: Fire Sprinkler Final
Inspector: D.Meneses
Result: Approved
Comment: 1pm if available 2nd and 3rd CCO for FFnE (no ceiling tiles) Requested by: Isaac Whisman 9075292099 JASONANDO13@GMAIL.COM

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
8/4/2026 firesprinkl13CCO ApprovedCCO approved for fire sprinkler system2nd and 3rd floorsokay for C.C.O.  for FF&E  Furniture loading in rooms only.  
1/12/2026 firesprinklr14Correction(s) #1<div>Correct the following item(s):</div><div><br></div> <h2><p class="MsoNormal"><span style="font-weight: normal;">Sprinkler system components shall not be used to support nonsprinkler system components.&nbsp;Other disciplines cannot be supported by the sprinkler system. NFPA 13 Section 4.9.</span><o:p></o:p></p></h2>
1/12/2026 firesprinkl15Correction(s) #2<div>Correct the following item(s):</div><div><br></div> Anything touching the CVPC mush be checked for compatibility with the Blaze Master Instillation instructions.
1/12/2026 firesprinkl16Correction(s) #3<div>Correct the following item(s):</div><div><br></div> <p data-start="63" data-end="225"><strong data-start="63" data-end="223">Hangers shall be installed in accordance with the manufacturer’s installation instructions and shall not have rough or sharp edges in contact with the pipe.</strong></p> <p data-start="232" data-end="439" data-is-last-node="">The hangers observed in <strong data-start="256" data-end="268">Room 336</strong> are not the approved type. <strong data-start="296" data-end="439" data-is-last-node="">Verify that all pipe hangers in this area are correct and replace as necessary to comply with the manufacturer’s installation requirements.</strong></p>