Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To View Another Inspection


Inspection #: 909798
Inspection Type: Mechanical Rough
Inspector: K.Hanson
Result: Correction
Comment: Partial Mechanical Rough - Approved To include 1st layer of fire wrap from 4th fl at previously inspected wrap of both layers to 1st fl lid, OK for 2nd layer, S & E/A above hardlid in SW corner of lobby, OK to cover. See corrections.

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
7/20/2026TransferMechRghSee commentsSee Inspector CommentsGrease ductAs per 2018 IMC 506.3.8 & 506.3.9 COs required.
6/15/2026TransferBoilerRough 20BVENT SupportB-Vent is not properly supported- per manufacture install guide, IFGC 506.2 and UPC 510.7.6 (S/W)DVFP ventingSupport venting per manufacturer's required intervals.
6/15/2026TransferMechRghSee commentsSee Inspector CommentsDVFP ventingSupport venting per manufacturer's required intervals.
6/15/2026TransferMechRghSee commentsSee Inspector CommentsDVFP ventingScrews shall not penetrate inner wall of B-vent. Provide tool to remove screw(s) for inspection of screw penetration. If screws have penetrated inner wall, replacement of compromised B-vent required.
6/15/2026TransferMechRgh25Fireplace Install InstructionsProvide installation instructions for fireplaceDVFP power venterInstall guide shall be onsite for review during inspection.
ADA Compliance      Privacy Statement & Disclaimer      Employee Search      eNewsletter      RSS