Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To View Another Inspection


Inspection #: 907939
Inspection Type: Mechanical Rough
Inspector: K.Hanson
Result: Partial
Comment: Partial Mechanical Rough - Approved To include the install of S & R/A duct serving rms 16 & 17 w/ 2-EFs (E/A duct incomplete), remaining S/A mains in 2nd fl corridor & vertical shafts down to 1st fl, OK to cover. NOTE: Grease duct COs required no less than every 20' and 10' from changes in direction, openings shall be no less than 12"x12".

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
6/15/2026TransferBoilerRough 20BVENT SupportB-Vent is not properly supported- per manufacture install guide, IFGC 506.2 and UPC 510.7.6 (S/W)DVFP ventingSupport venting per manufacturer's required intervals.
6/15/2026TransferMechRghSee commentsSee Inspector CommentsDVFP ventingSupport venting per manufacturer's required intervals.
6/15/2026TransferMechRghSee commentsSee Inspector CommentsDVFP ventingScrews shall not penetrate inner wall of B-vent. Provide tool to remove screw(s) for inspection of screw penetration. If screws have penetrated inner wall, replacement of compromised B-vent required.
6/15/2026TransferMechRgh25Fireplace Install InstructionsProvide installation instructions for fireplaceDVFP power venterInstall guide shall be onsite for review during inspection.
ADA Compliance      Privacy Statement & Disclaimer      Employee Search      eNewsletter      RSS