Click Here To View Another Inspection Inspection #: 896322 Inspection Type: Framing / Int. Inspector: J.Bergstrom Result: Partial Comment: Verified rim joist A35 connections complete at 2nd floor framing. Complete joist hanger nails at north wall line, install correct joist hangers at north wall line, head outs where joist were cut for plumbing and complete 1st floor int. shear wall connections to 2nd floor diaphragm - not complete at this time. Inspection Corrections DateStatusCodeDescriptionRefLocationComments