| Date | Status | Code | Description | Ref | Location | Comments |
| 1/15/2026 | Transfer | FireSprinkRough11 | Notes | Notes: | | ADVISORY - Main piping runs along the length of the corridor could be subject to significant thermal expansion. Adjust piping and branch line penetrations as necessary // PANILO |
| 1/12/2026 | Corrected | FireSprinkRough3 | Correction(s) #3 | Correct the following item(s): | | <p><strong>Hangers shall be installed in accordance with the manufacturer’s installation instructions and shall not have rough or sharp edges in contact with the pipe.</strong></p><p>The hangers observed in <strong>Room 336</strong> are not the approved type. <strong>Verify that all pipe hangers in this area are correct and replace as necessary to comply with the manufacturer’s installation requirements. </strong></p><p><strong><br></strong></p><p><strong>Revised hangers provided // PANILO</strong></p> |
| 1/12/2026 | Corrected | FireSprinkRough2 | Correction(s) #2 | Correct the following item(s): | | Any materials or components in contact with CPVC piping shall be verified for compatibility with CPVC in accordance with the BlazeMaster installation instructions. <div><br></div><div>Separation of construction materials provided on 3rd and 4th floors // PANILO</div> |
| 1/12/2026 | Corrected | FireSprinkRough1 | Correction(s) #1 | Correct the following item(s): | 3rd and 4th floor | <h2><p><span>Sprinkler system components shall not be used to support non-sprinkler system components.<br></span><span>Supporting other trades or disciplines from the sprinkler system is not permitted in accordance with NFPA 13, Section 4.9. </span></p><p><span><br></span></p><p><span>Separation of construction materials provided on 3rd and 4th floor // PANILO</span></p><p class="MsoNormal"></p></h2> |