Inspection #: 887868
Inspection Type: Fire Sprinkler Rough-In
Inspector: M.Panilo
Result: Partial
Comment: Would like to schedule re-inspections for rough in corrections on floors 3 & 4. AM or PM Requested by: Joshua Daly (907)306-5007 Jando@yukonfire.com

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
1/15/2026TransferFireSprinkRough11NotesNotes: ADVISORY - Main piping runs along the length of the corridor could be subject to significant thermal expansion. Adjust piping and branch line penetrations as necessary // PANILO
1/12/2026CorrectedFireSprinkRough3Correction(s) #3Correct the following item(s): <p><strong>Hangers shall be installed in accordance with the manufacturer’s installation instructions and shall not have rough or sharp edges in contact with the pipe.</strong></p><p>The hangers observed in&nbsp;<strong>Room 336</strong>&nbsp;are not the approved type.&nbsp;<strong>Verify that all pipe hangers in this area are correct and replace as necessary to comply with the manufacturer’s installation requirements.&nbsp; &nbsp; &nbsp;</strong></p><p><strong><br></strong></p><p><strong>Revised hangers provided // PANILO</strong></p>
1/12/2026CorrectedFireSprinkRough2Correction(s) #2Correct the following item(s): Any materials or components in contact with CPVC piping shall be verified for compatibility with CPVC in accordance with the BlazeMaster installation instructions.&nbsp; &nbsp; &nbsp;<div><br></div><div>Separation of construction materials provided on 3rd and 4th floors // PANILO</div>
1/12/2026CorrectedFireSprinkRough1Correction(s) #1Correct the following item(s):3rd and 4th floor<h2><p><span>Sprinkler system components shall not be used to support non-sprinkler system components.<br></span><span>Supporting other trades or disciplines from the sprinkler system is not permitted in accordance with NFPA 13, Section 4.9.&nbsp; &nbsp; &nbsp;</span></p><p><span><br></span></p><p><span>Separation of construction materials provided on 3rd and 4th floor // PANILO</span></p><p class="MsoNormal"></p></h2>