Click Here To View Another Inspection Inspection #: 887454 Inspection Type: Sprinkler Hydrostatic Test Inspector: N.Thomson Result: Partial Comment: 3rd and 4th floor Hydro Requested by: Josh Daly 907-306-5007 jdicarlo@yukonfire.com Inspection Corrections DateStatusCodeDescriptionRefLocationComments 1/12/2026TransferFireSprkHydro2Partial Hydrostatic TestPartial approval for fire sprinkler system hydrostatic test for the following area(s): Hydro for floors 3 and 4 are approved.