| Date | Status | Code | Description | Ref | Location | Comments |
| 12/23/2025 | Transfer | MechFinal | See comments | See Inspector Comments | HRU-101 | Attachment to pad incomplete. |
| 12/23/2025 | Transfer | MechFinal | See comments | See Inspector Comments | RTU | RTU condensate incomplete. |
| 12/18/2025 | Transfer | MechFinal | See comments | See Inspector Comments | Pool room | Pool rm incomplete. |
| 12/18/2025 | Transfer | MechFinal | See comments | See Inspector Comments | Rooftop duct & piping | Insulation required. |
| 12/18/2025 | Corrected | MechFinal | See comments | See Inspector Comments | Mechanical rm | Thermometers not installed, cap open pipes. |
| 12/18/2025 | Transfer | MechFinal | See comments | See Inspector Comments | Rooftop AC equipment | As per 2018 IMC 304.11 guard required. |