| Date | Status | Code | Description | Ref | Location | Comments |
| 12/18/2025 | | PlumbFinal | Comments | See Inspector Comments | Pool | Pool incomplete. |
| 12/18/2025 | | PlumbFinal | Comments | See Inspector Comments | 3-comp sink | As per UPC 2018 312.2 secure sink. |
| 12/18/2025 | | PlumbFinal17 | Backflow Preventer Required | An approved backflow preventer is required-UPC 602.2 | Coffee maker | As per 2018 UPC 603.5.12 ASSE 1022 listed device required. |
| 12/18/2025 | | PlumbFinal | Comments | See Inspector Comments | Steam kitchen equipment | Per local amendment to 2018 UPC 603.5.28 ASSE 1012 listed device required. |
| 12/18/2025 | | PlumbFinal | Comments | See Inspector Comments | Gas flexes serving commercial clothes dryers | Flexes undersized. |
| 12/18/2025 | | PlumbFinal17 | Backflow Preventer Required | An approved backflow preventer is required-UPC 602.2 | H & C commercial clothes washer piping | RPBAs required per CCCM due to high hazard designation. |
| 12/18/2025 | | PlumbFinal | Comments | See Inspector Comments | HRU 101 piping in housekeeping rm | Labels required. |
| 12/18/2025 | | PlumbFinal | Comments | See Inspector Comments | HRU-101 & 102 | Condensate piping incomplete. |
| 12/18/2025 | | PlumbFinal6 | ADA Requirements | Fixtures are not installed per ADA requirements-Per ANSI A1171.1 code | Employee & public lavs | Lav guards & ASSE 1070 mix valves required. |
| 12/18/2025 | | PlumbFinal2 | Caulk Fixtures | Fixture(s) shall be caulked-407.2 | Employee & public restrooms | |