Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To View Another Inspection


Inspection #: 885982
Inspection Type: Final Plumbing
Inspector:
Result:
Comment: Plumbing CCO/Final Phase 1 per X25-1854. Requested to start level 4 and work down. Requested by: Dave Vandersloot 907-360-8151 dfrashier@klebsheating.com

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
12/18/2025 PlumbFinalCommentsSee Inspector CommentsPoolPool incomplete.
12/18/2025 PlumbFinalCommentsSee Inspector Comments3-comp sinkAs per UPC 2018 312.2 secure sink.
12/18/2025 PlumbFinal17Backflow Preventer RequiredAn approved backflow preventer is required-UPC 602.2Coffee makerAs per 2018 UPC 603.5.12 ASSE 1022 listed device required.
12/18/2025 PlumbFinalCommentsSee Inspector CommentsSteam kitchen equipmentPer local amendment to 2018 UPC 603.5.28 ASSE 1012 listed device required.
12/18/2025 PlumbFinalCommentsSee Inspector CommentsGas flexes serving commercial clothes dryersFlexes undersized.
12/18/2025 PlumbFinal17Backflow Preventer RequiredAn approved backflow preventer is required-UPC 602.2H & C commercial clothes washer pipingRPBAs required per CCCM due to high hazard designation.
12/18/2025 PlumbFinalCommentsSee Inspector CommentsHRU 101 piping in housekeeping rmLabels required.
12/18/2025 PlumbFinalCommentsSee Inspector CommentsHRU-101 & 102Condensate piping incomplete.
12/18/2025 PlumbFinal6ADA RequirementsFixtures are not installed per ADA requirements-Per ANSI A1171.1 codeEmployee & public lavsLav guards & ASSE 1070 mix valves required.
12/18/2025 PlumbFinal2Caulk FixturesFixture(s) shall be caulked-407.2Employee & public restrooms 
ADA Compliance      Privacy Statement & Disclaimer      Employee Search      eNewsletter      RSS