| Date | Status | Code | Description | Ref | Location | Comments |
| 12/8/2025 | Transfer | Correct Below | * | | | Listing of interior panel required. (transfer switch, panel board control panel. Appears that the panelboard and transfer portions are labeled, but not the remainder of the equipment as an assembly. UPDATE 1/22/26: Provide additional information as discussed onsite. Drawing that is noted on equipment required. Provide copy for review aswell. At this time, listing labels do not appear to be for an overall third party evaluation. |