Click Here To View Another Inspection Inspection #: 884922 Inspection Type: Fire Rated Wall(s) Inspector: P.Calhoun Result: Correction Comment: First layer drywall at 3rd and 2nd floor corridor ceilings GL 1-12. Requested by: Alex Jansen 5039841183 ajansen@jansenconstructioncompany.com Inspection Corrections DateStatusCodeDescriptionRefLocationComments 12/9/2025TransferFIREWALLCSee Inspector commentsInspector comments Provide GWB at joust spaces of elevator, mechanical and stair shafts.