| Date | Status | Code | Description | Ref | Location | Comments |
| 12/8/2025 | Transfer | Correct Below | * | | | Listing of interior panel required. (transfer switch, panel board control panel. Appears that the panelboard and transfer portions are labeled, but not the remainder of the equipment as an assembly. |
| 10/9/2025 | Corrected | Correct Below | * | | | 1. Provide access to inspect all portions of the work. Open equipment and shelter for inspection.
2. Fasten LFMC at transformer.
3. Verify and label AFC and date at service. Provide access. |