| Date | Status | Code | Description | Ref | Location | Comments |
| 9/24/2025 | Transfer | Correct Below | * | | | Phase 4 - Brewery and tasting areas incomplete. |
| 9/24/2025 | Corrected | Correct Below | * | | Panel CP | Provide panel schedule, label with sources and AFC/date. Also crimp GEC connection to transformer. |
| 9/24/2025 | Corrected | Correct Below | * | | | Platform required at microturbine so that disconnect switch is not higher than 6'7". |