| Date | Status | Code | Description | Ref | Location | Comments |
| 9/24/2025 | Transfer | Correct Below | * | | | 3rd floor kitchen, brewery and tasting areas incomplete. |
| 9/24/2025 | Transfer | Correct Below | * | | Panel CP | Provide panel schedule, label with sources and AFC/date. Also crimp GEC connection to transformer. |
| 9/24/2025 | Transfer | Correct Below | * | | | Platform required at microturbine so that disconnect switch is not higher than 6'7". |
| 8/1/2025 | Transfer | Correct Below | * | | MDP-a | Labeling required for microturbine connection on MDP to not relocate breaker. As well as 705.12 (B)(3)(2) for alternate source. |
| 8/1/2025 | Corrected | Correct Below | * | | MDP-A | One line shows 1200 amp OCPD. main appears to be 2000 amp. |
| 8/1/2025 | Corrected | Correct Below | * | | | Panels in lower level electrical room need labeling for panel designation and AFC/date. labeling required at shunt trips per E.04. and for alternate sources at service equipment. |
| 8/1/2025 | Transfer | Correct Below | * | | | MDP-A: drain pipe in working clearance near floor of equipment. |
| 8/1/2025 | Corrected | Correct Below | * | | Cap off unused raceways at future capstones. | |
| 5/13/2025 | Corrected | Correct Below | * | | Phase 3 | 3 pendant lights incomplete.
Fireplace incomplete. |
| 4/30/2025 | Corrected | Correct Below | * | | | Kitchen coffee maker incomplete. |