DateStatusCodeDescriptionRefLocationComments
7/9/2025 Correct Below* (2) 3-phase mixers.Engineer will need to verify sizing and show on drawings. Was not possible to see ratings on mixers.
7/9/2025 Correct Below* Added 1-line items for 3-phase kitchen mixers.(2) mixers require a feeder from the 400A panel to a phase converter, buck / boost transformer, and 3-phase panel with 3-phase GFCI breakers. Engineer needs to verify installation and add to design with all appropriate calculations including AFC. Contractor will need to provide all required labelling.