Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To View Another Inspection


Inspection #: 862572
Inspection Type: Final Electrical
Inspector: O.Burbridge
Result: Cancel
Comment: Canceled by Chris

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
7/9/2025TransferCorrect Below* SF-4 and EF-1.Locations?
7/9/2025TransferCorrect Below* Automatic transfer switch ATS-SC.Verify 35KA rating or have engineer change note to accept a lesser short circuit current rating if applicable.
7/9/2025TransferCorrect Below* Installed system if intended as an NEC Article 700 emergency system.Labelling per 700.10(A) Identification. Panels, transfer switches, generators, conduits, etc. are required to be labelled as a part of the emergency system.
7/9/2025TransferCorrect Below* 1-line drawing and design.Smoke control / evacuation system may be an NEC 700, emergency system. There is a note referring to 700.3(F). Engineer needs to clearly identify type of system.
7/9/2025TransferCorrect Below* MTS-SC. Manual transfer switch to comply with 700.3(F).700.3(F) requires labelling to include phase rotation and system bonding requirements.
7/9/2025TransferCorrect Below* MTS-SC. Manual transfer switch installed to comply with 700.3(F).Verify 4-pole transfer switch to be compatible with generator configured as separately derived system. Verify 22KA short circuit current rating as required by note on 1-line.
7/9/2025TransferCorrect Below* Approved 1-line drawing.Installation does not conform to 1-line drawing - from Panel SCH to transformer to panel SCL. Engineer needs to update 1-line to show installed feeder OCPD and conductor sizes, XFMR size, fused disconnect instead of main circuit breaker in Panel SCL, etc.