Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To View Another Inspection


Inspection #: 858771
Inspection Type: Fire Sprinkler Rough-In
Inspector: N.Thomson
Result: Correction
Comment: 3rd and 4th floor rough in inspection Requested by: Josh Daly 907-306-5007 jdicarlo@yukonfire.com

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
1/12/2026TransferFireSprinkRough3Correction(s) #3Correct the following item(s): <p style="font-size: 12px;"><strong>Hangers shall be installed in accordance with the manufacturer’s installation instructions and shall not have rough or sharp edges in contact with the pipe.</strong></p><p style="font-size: 12px;">The hangers observed in&nbsp;<strong>Room 336</strong>&nbsp;are not the approved type.&nbsp;<strong>Verify that all pipe hangers in this area are correct and replace as necessary to comply with the manufacturer’s installation requirements.</strong></p>
1/12/2026TransferFireSprinkRough2Correction(s) #2Correct the following item(s): Any materials or components in contact with CPVC piping shall be verified for compatibility with CPVC in accordance with the BlazeMaster installation instructions.
1/12/2026TransferFireSprinkRough1Correction(s) #1Correct the following item(s): <h2><p><strong>Sprinkler system components shall not be used to support non-sprinkler system components.</strong></p><p class="MsoNormal"></p><p>Supporting other trades or disciplines from the sprinkler system is not permitted in accordance with<strong>NFPA 13, Section 4.9</strong>.</p></h2>
ADA Compliance      Privacy Statement & Disclaimer      Employee Search      eNewsletter      RSS