| Date | Status | Code | Description | Ref | Location | Comments |
| 6/18/2025 | Transfer | Correct electrical violation | * | | Plans | Provide full approved plans for review onsite to include A drawings for details about approved membrane for hazardous location. Detail should include hazardous location associated with inside of capped pilings entering the ground as well. Is there a detail for piling penetrating proposed membrane that is to block gasses from entering building? |