| Date | Status | Code | Description | Ref | Location | Comments |
| 5/16/2025 | | TempGas9 | See Comments below | | FAF Combustion Air (appliance enclosure and rooftop) | Provide listed approved combustion air duct to appliance enclosure in accordance with manufacturer's installation instructions, and Section 304 of the 2018 IFGC. |
| 5/16/2025 | | TempGas9 | See Comments below | | FAF Vent (appliance enclosure and rooftop) | Replace vent, vent, connector, and roof termination cap serving FAF, for listed approved vent system in accordance with manufacturer installation instruction, and Section 503 of the 2018 IFGC. |
| 5/16/2025 | | TempGas9 | See Comments below | | Natural Gas System Test (Exterior North Side) | Test entire natural gas system downstream of pressure regulator with no less than 10 psi for 15 minutes 2018 UPC Section 1213.3. |
| 5/16/2025 | | TempGas9 | See Comments below | | Range Gas Shutoff Valve (Kitchen) | Each gas fired appliance shall be provided with a shutoff valve within 6' of the appliance served, in accordance with 2018 UPC 1212.6 |