| Date | Status | Code | Description | Ref | Location | Comments |
| 7/20/2026 | Transfer | Correct Below | * | | | 1. Reactor cabinet and blower controller cabinets do not appear to be listed and will require field evaluations.
2. Bonding bushing required at transformer disconnect.
3. EM light in tunnel has no power.
4. Bond around water meter.
5. Monument sign must be fed with single multiwire branch circuit or have a panel that subfeeds the 3 circuits on the sign.
6. Labeling required per 210.5(C)(1).
7. Bathroom heater incomplete. |