Inspection #: 853719
Inspection Type: Plumbing Rough
Inspector: J.Bean
Result: Correction
Comment: See Corrections, all else ok for rough and test of DWV/Water piping serving Brewery and tasting Room

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
2/9/2026TransferPlumbRgh14CommentsSee Inspectors CommentsBlue PrintsWork being performed needs to be reflected on prints for addition of hose bibs and routing of combined in wall indirect drains to floor drain in tasting area. 2018 Anchorage Administration Code 23.10.104.12 - Amended construction documents. Work shall be installed in accordance with the approved construction documents, and any changes made prior to or during construction that are not in compliance with the approved construction documents shall be resubmitted for approval as an amended set of construction documents through a change order.
3/13/2025TransferPlumbRgh14CommentsSee Inspectors CommentsHangersHangers for ABS and Copper piping above head and in wall. 2018 UPC Table 313.3 Hangers and Supports: Copper Pipe - 1 1/2" and smaller every 6ft. ABS - Every 4ft horizontally and in wall provide midstory guide
3/13/2025TransferPlumbRgh14CommentsSee Inspectors CommentsTasting RoomCopper and ABS piping in wall need nail plates. 2018 UPC 312.9 Steel Nail Plates. Plastic and copper or copper alloy piping penetrating framing members to within 1" of exposed framing shall be protected by steel nail plates not less than 18 gauge in thickness.