| Date | Status | Code | Description | Ref | Location | Comments |
| 6/3/2025 | Transfer | Correct Below | * | | Panel | Blank off open spaces
Panel schedule required. |
| 5/6/2025 | Corrected | Correct Below | * | | Furnace | Romex shall not be exposed in feeding the furnace.
Box for shutoff switch needs an cover. |
| 5/6/2025 | Transfer | Correct Below | * | | Bonding | Need access under the trailer to verify gas, water, and steel framing is all bonded.
UPDATE: Bonding of water, gas, and framing Ground wire shall land in panel.
Service conductors shall be protected and not exposed. |
| 5/6/2025 | Corrected | Correct Below | * | | Panel | 1) Was unable to take off panel cover.
2) All 120V circuits shall be AFCI and GFCI protected.
3) Update panel schedule
4) Dryer circuit shall be GFCI protected |