| Date | Status | Code | Description | Ref | Location | Comments |
| 4/17/2025 | Transfer | FNLSG | Final Structural Other | Please correct the following: | | 10:10 Provide address on building. <div>10:11 Provide exterior side landings on west exits and handrails at steps. </div><div>10:13 Cleanup construction debris and remove tools from area </div><div>10:14 Install guards at exterior deck </div><div>10:15 Complete all exterior finishes / trims / caulking and electrical box covers and lighting at exits. </div><div>10:17 Install all fire extinguishers. </div><div>10:17 provide signage at restrooms and other spaces requiring signage. </div><div>10:20 Provide deferred submittals as indicated on previous inspection report. </div><div>10:25 install all finishes on stair treads and handrails</div> |