| Date | Status | Code | Description | Ref | Location | Comments |
| 4/17/2025 | Transfer | FNLSG | Final Structural Other | Please correct the following: | stair from 1st to 2nd floor | install all finishes on stair treads and handrails |
| 4/17/2025 | Transfer | FNLSG | Final Structural Other | Please correct the following: | | Provide deferred submittals as indicated on previous inspection report. |
| 4/17/2025 | Transfer | FNLSG | Final Structural Other | Please correct the following: | | provide signage at restrooms and other spaces requiring signage. |
| 4/17/2025 | Transfer | FNLSG | Final Structural Other | Please correct the following: | | Install all fire extinguishers. |
| 4/17/2025 | Transfer | FNLSG | Final Structural Other | Please correct the following: | | Complete all exterior finishes / trims / caulking and electrical box covers and lighting at exits. |
| 4/17/2025 | Transfer | FNLSG | Final Structural Other | Please correct the following: | | Install guards at exterior deck |
| 4/17/2025 | Transfer | FNLSG | Final Structural Other | Please correct the following: | | Cleanup construction debris and remove tools from area |
| 4/17/2025 | Transfer | FNLSG | Final Structural Other | Please correct the following: | | Provide exterior side landings on west exits and handrails at steps. |
| 4/17/2025 | Transfer | FNLSG | Final Structural Other | Please correct the following: | | Provide address on building. |