| Date | Status | Code | Description | Ref | Location | Comments |
| 10/1/2025 | Transfer | Correct service item below | * | | | 1. Verify and provide Full load current of pump to verify adequate OCPD protection of conductors for locked rotor current.
2. Lockable disconnect required for fire pump. See 695.4 (B)(3).
3. Ensure fire rated circuit for pump wiring within building. |