| Date | Status | Code | Description | Ref | Location | Comments |
| 1/8/2026 | Transfer | Correct Below | * | | New panels. | Provide plans detailing AFC and date for added panels. Label panels with AFC information to include date of calculation. |
| 1/8/2026 | Transfer | Correct Below | * | | Fire pump room. | Lighting shown to be battery backed em lighting. Currently not installed, standard lighting installed. Plans show 4 ea. in this area. |
| 1/8/2026 | Transfer | Correct Below | * | | Garage area. | GFCI protection required for all new receptacles per 210.8. Various locations throughout. |