| Date | Status | Code | Description | Ref | Location | Comments |
| 11/8/2024 | | FRAMA | See Inspector comments | See Inspector comments | | Partial inspection of interior of new structure/roof |
| 11/8/2024 | | FRAMB | Change Order | Provide change order for | Roof sheeting | 7/16" OSB in place and plans shown 15/32" or 1/2" |
| 11/8/2024 | | FRAMA | See Inspector comments | See Inspector comments | 2X4 Eve blocks | Provide ventilation holes and screen in blocks. |
| 11/8/2024 | | FRAMB | Change Order | Provide change order for | Support of roof system | Support of roof using existing trailer doesn't have a connection detailed in the plans. |
| 11/8/2024 | | FRAMD | NC floor diaphram blocking | Complete floor diaphram blocking per plans | Floor diaphragm. | Add blocking as shown on plans. |
| 11/8/2024 | | FRAMS | Not Ready | Complete all plumbing, Mechanical and Electrical rough-ins, RECALL. | Exterior sheeting | Install exterior sheeting and nail per plan schedule as shown 6" on edge and every 12" in the field. |