Click Here To View Another Inspection Inspection #: 830576 Inspection Type: Shearwall / Interior Inspector: B.Gilgus Result: Partial Comment: Shear-wall #3 running North-South shear-nail, Framing& anchor -bolts behind panel locations in Shear-wall#3. Approved** Note** use of putty pads in locations where boxes back to back in same stud-bay is acceptable. Thank you Requested by: Brandyn Roth 907-717-5004 Brandyn@spinellhomes.com Inspection Corrections DateStatusCodeDescriptionRefLocationComments