Date | Status | Code | Description | Ref | Location | Comments |
10/21/2024 | Transfer | FIREWALLC | See Inspector comments | Inspector comments | South exterior fire wall | First layer fastened per listed assembly, however assembly doesn't list the termination point, as this assembly is directly below roof ventilation skip blocking. Hip roof. Where does the assembly terminate to? |