Click Here To View Another Inspection Inspection #: 825055 Inspection Type: Plumbing Rough Inspector: Y.Dovba Result: Partial Comment: Dwv and water piping rough-in and tests Approved. main floor 2-restrooms, 2-showers and 1-utility room. NOTE: Shower valves not installed at this time. NOTE: Confirm the ceiling is not utilized as a return plenum. otherwise ABS piping will need to be replaced with cast-iron. Inspection Corrections DateStatusCodeDescriptionRefLocationComments