Date | Status | Code | Description | Ref | Location | Comments |
9/9/2024 | Transfer | PlumbRgh14 | Comments | See Inspectors Comments | Water piping | As per 2018 UPC 609.10 hammer arrestors required. |
7/18/2024 | Transfer | PlumbRgh14 | Comments | See Inspectors Comments | | Cleanouts required for WC and most sinks. All drain lines on 1st floor beyond 5 feet from main require a cleanout.
THIS IS FOR ENTIRE FIRST FLOOR |