Date | Status | Code | Description | Ref | Location | Comments |
9/25/2024 | Transfer | Correct service item below | * | | Approved drawings. | Required to have on site, PRINTED, APPROVED set showing current service configuration. |
9/25/2024 | Transfer | Correct service item below | * | | Grounding electrode conductor to water line. | Connect within 5ft of entry into building. |
9/25/2024 | Transfer | Correct service item below | * | | Service lateral conduits. | Install bonding locknuts and insulating bushings. |