| Date | Status | Code | Description | Ref | Location | Comments |
| 6/20/2024 | Transfer | BackflowInsp | Tested and Tagged | Backflow assembly shall be tested and properly tagged- UPC 603.4.2 | Irrigation BP | |
| 6/20/2024 | Transfer | PlumbRgh9 | Plans | Approved plans must be on site | | |
| 6/20/2024 | Corrected | GasPipeCom | See comments | | Boiler gas piping | Union fitting required downstream of boiler isolation valves to serve each boiler per 2018 IFGC. |
| 6/20/2024 | Corrected | GasRgh14Piping | See comments | see comments | Boiler gas piping | Union fitting required downstream of boiler isolation valves to serve each boiler per 2018 IFGC. |